Importance of Commissioning Planning
- justinwu89
- Jun 11, 2023
- 6 min read
Sub-title: Testing XXXXXXXXXXXXXXXXXXXXXXXXXXXX
Commissioning Plan
Successful commissioning starts with a commissioning plan, which establishes a framework for how commissioning will be handled and managed on a project. Serving as a project roadmap, it identifies all parties involved, their roles and responsibilities, and the documentation required.
Planning begins with a solid schedule and process systemization. For instance, in a chemical plant, process systemization involves a commissioning process engineer taking the project’s piping and instrumentation diagrams (P&IDs) and identifing sub-systems that can be broken out and prioritized based on a logical sequence of events to start up the facility. The commissioning engineer will then work with the contractor to prioritize construction completion to meet this systemized startup sequence. This allows the contractor to refocus construction efforts in a way that permits an overlap of plant startup activities with construction, minimizing the overall time required to commission and start up the facility.
Selecting the Team
For a chemical plant, a commissioning team should include a chemical process engineer, a mechanical engineer and an electrical, controls and instrumentation engineer. A chemical process engineer will help with understanding processes as they are designed. A mechanical engineer is mostly responsible for the full check and verification of all mechanical equipment in the field. The electrical, controls and instrumentation engineer handles all electrical power distribution systems and instrumentation testing and documentation. Of course, this is not a comprehensive list of all the responsibilities for every player on the team, as the scope of commissioning differs from plant to plant and client to client.
Document, Document, Document
The true value of commissioning documentation can easily go unnoticed. If the commissioning is a success, the commissioning documents may remain untouched for many years. However, if something does go awry, it is extremely important to have a detailed collection of all commissioning tests and procedures to verify that everything was done to the correct standards and practices. This will help solve the root cause of any machine or system failure. At the end of a project, when the question is asked: “Was that test completed?” a member of the compliance team should always be able to say with confidence: “Yes, I saw it with my own eyes, and I have the documentation to prove it.”
Some teams use a cloud-based commissioning software program that allows them to add documentation remotely, giving the contractor immediate access to vital information such as PFT inspections, photos, equipment and piping drawings, systemized to match process systemization and schedule priorities.
Every final approval and sign-off for cleaning, testing, inspection and acceptance flows through the commissioning team. They will record all documents, which will be compiled into a handover package. Handover serves as the sign-off on responsibility from the contractor to the owner, who will then be 100% responsible for operating each system.
Putting a Checklist Together
Another significant task of the commissioning team is to verify that construction is proceeding as necessary to start up the plant. Any deficiencies will be documented on a punch list and then distributed to the construction team for rectification. While conducting the walkthrough, the commissioning engineer won’t just be looking for loose bolts or missing valves. They will also be evaluating the system from an all-important operator’s perspective. This includes checking for safety issues around the work area, making sure that all valves and platforms are accessible to operators, and that the system can be operated safely.
Understanding How the Pieces Fit
A good commissioning plan can make or break a project’s budget and schedule. It can save a company time and money at every stage of a project, while preventing safety and operability issues, increasing productivity, lowering downtime, and perhaps most importantly, giving the person charged with starting up the plant the confidence to finally push that green button.
Ultimate Guides are blog posts designed to be the best of the best. It's supposed to be the blog post to end all blog posts–everything your reader will ever need to know about the subject.
To boost the post’s SEO, include a keyword in the title.

Every great guide should start with an introductory paragraph. This is your opportunity to persuade your reader and let them know why this post will answer all their important questions. You can share why you are the ideal person to write this guide; write a personal anecdote about how you became an expert in the field; show your empathy with your reader regarding how hard it is to find accurate information; and/or stress the frequent mistakes people make that can be avoided.
Before writing your “how-to” or “best-of” post below, add one last sentence that sums up your paragraph and offers a polished transition to your guide.
Some Quick Guidelines on Formatting
Don’t make your guide longer than 2000 words. In an ultimate guide, you also have a lot of space to use your SEO keywords. Put 2-3 keywords around in the post, in the H2 headings, and in the text itself. Add Anchors Links much like a table of contents where readers can click and go to a section of the post. To add them, click on Link in the toolbar above, select Section and select one of the headings in the post.
Heading #1: Why Is This Topic So Important?
In this first section, you set the stage for your readers. This is where you remind your site visitor, in greater detail, about the topic at hand. You can offer a brief history of the issue as well as when and how it became so popular or vital; describe the geographic location or setting if your guide is travel-focused; relay the possible mishaps that occur (or can occur) to someone who doesn’t stay up-to-date with current trends; and explain how practical implementation of your recommendations is simple.
This is your chance to get your reader excited about the guide and appreciate the real value behind reading the post in its entirety.
To boost the post's SEO, be sure to include keywords in the heading and format them as Heading 2 or Heading 3.
Heading #2: What are the Nuts and Bolts of Your Guide?
Get ready to explain everything! Start with a catchy introductory sentence or two to get the ball rolling, and then begin sharing your insights with your audience.
Decide from the start of this section if you want to write your detailed explanation of your expert guide (i.e. Parisian Restaurants or Vitamin and Mineral Supplements or SEO Steps) as a list or separate subheadings. The most important thing is to be consistent. Each entry should be clearly distinguishable and you should offer your reader concrete insights throughout.
Explain with examples and anecdotes. Try to give different perspectives so readers with different backgrounds understand. Think about your audience. Are you talking to beginners or more advanced readers? Do you need to use a more professional writing style, or a friendly and casual tone that is more relatable?
Remember that this is the largest section of your guide. Add images to make the post more dynamic and interesting, and include links from other sources or to one of your previous posts. You may want to include something personal or funny along the way to lighten the load and make the read more enjoyable.
Heading #3: Is Your Reader Feeling Empowered?
It’s time for your readers to start applying what they have begun to master. Leave your reader feeling like they learned a lot. In this last section, you can write one or two paragraphs that remind your audience what they have learned; what are the first steps they can take to apply all your advice and coaching (i.e. make reservations to the perfect restaurants in Paris for an upcoming holiday; purchase vitamin supplements or make an appointment with a nutritionist; or check their SEO search engine rankings and keywords). Provide them the needed links (can be an affiliate) to get going and encourage them to soar.
You can also remind them of other resources you have on your website as well as paid services or events that you offer. Don’t be shy. They may have more questions after reading (or in the future). Invite them to leave comments below the post so they stay engaged.
Comments